This was a multi-phase project that included phasing shut down and gutting of the 10-story Ocean Tower and the 18-story Pacific Tower. Adding to the complexity of this project was the required removal of the aging cooling tower on top of the Pacific Tower via multiple helicopter lifts. The three-story Diamond Head Tower underwent a partial renovation to create new meeting room and board room facilities as well as the pool bar and restaurant.

The design-assist lobby renovation encompassed the interior and exterior ground floor, including redesigned commercial spaces, walkways, landscaping and a water feature. The entire front entry was also rebuilt. This flagship property remained operational during the renovation.

GCA-logo

GCA Build Hawaii Award – 2010 Honorable Mention